Heat pump installation
We install heat pumps in flats, houses and commercial buildings.
Installation
Installation of any complexity
We handle the whole installation – from helping you choose a heat pump to showing you how to use it. We take on work of any complexity. By arrangement, we can also come outside business hours – for an additional charge.
Describe your property or send us photos – we’ll confirm the work needed, calculate the price and arrange an installation date.
We install air-to-air and air-to-water heat pumps in Tallinn and Harju County, elsewhere in Estonia by arrangement. Turnkey installation: we help you choose the unit, install and test it, and show you how to use it.
What standard installation includes (air-to-air heat pump and air conditioner)
- travel to the site and installation labour (technicians must have access to the site);
- unpacking the unit;
- mounting the indoor and outdoor unit at a height of up to 2.5 m;
- up to 5 m of interconnecting pipework and power cable between the indoor and outdoor units;
- outdoor unit wall bracket, vibration isolation and rubber mounting bushes;
- 2 m of plastic trunking for pipes and cables, a wall opening cover and a condensate hose;
- drilling through one wall up to 50 cm thick (reinforced concrete, natural stone, limestone, red brick etc. by arrangement);
- power supply near the indoor or outdoor unit, within 2.5 m;
- consumables for standard installation;
- testing the unit and explaining its main functions.
For an extra charge, if needed
- outdoor unit ground mounting (ground stand) and a stone slab under the outdoor unit;
- longer piping and trunking;
- bringing power to the unit, fitting a circuit breaker in the distribution board and running the cable;
- use of a lift (by arrangement);
- diamond drilling through reinforced concrete, natural stone, limestone, red brick etc. (by arrangement).
How installation works
- Enquiry. Describe the building and the installation location, and attach photos if possible.
- Offer. We choose a suitable unit and prepare an offer for the unit and installation.
- Installation. An air-to-air heat pump is usually installed in one working day, an air-to-water heat pump in up to two days, depending on the site.
- Start-up. We test the unit and show you how to use it.
Frequently asked questions
How long does installation take?
An air-to-air heat pump is usually installed in one working day, an air-to-water heat pump in up to two days. The exact time depends on the house or flat.
What do I need to prepare?
Usually nothing. If access is limited or work at height is needed, we will tell you in advance what to prepare.
Do you install in flats?
Yes, we install in flats, houses and commercial buildings.
Can the unit be mounted higher than 2.5 m or with longer piping?
Yes, for an extra charge. Mounting at a greater height is agreed before the work.
Can I order installation outside working hours?
Yes, by arrangement, for an extra charge.
Enquiry
Request a quote
- Business hours
- Mon–Fri 9:00–17:00